Cas
Maison > Cas > Deyang Dongsen Hydropower Equipment Co., Ltd. le dernier cas de société environ 3 × 1,050 kW Francis Turbine Units for Isfayram HPP-1 in Kyrgyzstan — Dongsen Hydropower Case Study
Événements
Contactez-nous
86-0838-2443007
Contact maintenant

3 × 1,050 kW Francis Turbine Units for Isfayram HPP-1 in Kyrgyzstan — Dongsen Hydropower Case Study

2026-11-25

Les dernières nouvelles de société environ 3 × 1,050 kW Francis Turbine Units for Isfayram HPP-1 in Kyrgyzstan — Dongsen Hydropower Case Study

Project Overview

Isfayram HPP-1 is a hydropower station developed in the Isfayram river basin of Kyrgyzstan, built to reinforce regional power supply and reduce dependence on imported electricity. Deyang Dongsen Hydropower Equipment Co., Ltd. was appointed as the equipment partner for the generating plant, delivering three Francis turbine generating units rated at 1,050 kW each.

Project Snapshot

Item Detail
Project name Isfayram HPP-1 (Isfayram Hydropower Station, Stage 1)
Location Kyrgyzstan
Unit configuration 3 units × 1,050 kW
Turbine type Francis
Supplier Deyang Dongsen Hydropower Equipment Co., Ltd.
Scope Design, manufacture, supply, installation and commissioning support


Scope of Supply

  • Three Francis turbine runners and distributors engineered for the station's head and flow conditions
  • Three generators matched to the 1,050 kW rated output of each unit
  • Inlet valves, speed governors, excitation systems and unit control panels
  • Auxiliary equipment: lubrication, cooling, drainage and compressed air systems
  • Engineering coordination with the civil works contractor for embedment, alignment and interfaces
  • Site installation supervision, testing, commissioning and operator training

Engineering Approach

Each unit was engineered from the project's hydraulic parameters rather than adapted from a standard catalogue design. Dongsen's engineering team worked from the station layout to confirm runner geometry, shaft arrangement and generator matching, then followed a controlled manufacturing route with dimensional inspection and factory testing before shipment.

Because the equipment had to travel to a landlocked Central Asian site, packing, marking and delivery sequencing were planned together with the customer's logistics provider, so that embedment parts arrived ahead of the main unit components.

Installation and Commissioning

Dongsen site engineers supported alignment, shaft run-out checks, governor setting and no-load to full-load testing of all three units. Each unit was verified through mechanical run tests, temperature and vibration monitoring, and load rejection checks before handover.

Results

  • Three 1,050 kW Francis units delivered, installed and put into commercial operation as one coordinated plant
  • Stable output across the station's operating range, with vibration and bearing temperatures within acceptance limits
  • Local operating staff trained on unit start-up, normal operation and shutdown procedures

Quality Assurance Along the Supply Chain

Pressure-retaining components were examined before assembly, and each unit’s control and protection circuits were functionally tested as a complete system rather than as separate panels. Inspection records, material certificates and test reports were compiled into a handover dossier, giving the station operator a traceable baseline for future maintenance, overhaul planning and spare-part ordering.

This project reflects Dongsen's capability to deliver complete turbine-generator packages for overseas hydropower stations — from hydraulic design and manufacturing through to installation and commissioning — backed by ISO 9001:2015 quality management and full in-house testing infrastructure.

Envoyez-votre enquête directement nous