logo
player background
live avator

5s
Total
0
Today
0
Total
0
Today
0
  • What would you like to know?
    Company Advantages Sample Service Certificates Logistics Service
Online Chat WhatsApp Inquiry
Auto
resolution switching...
Submission successful!
Cas
Maison > Cas > Deyang Dongsen Hydropower Equipment Co., Ltd. le dernier cas de société environ 5 × 500 kW Axial-Flow Turbines for Xinsheng Hydropower Station in China — Dongsen Project Case Study
Événements
Contactez-nous
86-0838-2443007
Contact maintenant

5 × 500 kW Axial-Flow Turbines for Xinsheng Hydropower Station in China — Dongsen Project Case Study

2026-11-25

Les dernières nouvelles de société environ 5 × 500 kW Axial-Flow Turbines for Xinsheng Hydropower Station in China — Dongsen Project Case Study

Project Overview

Xinsheng hydropower station is a low-head plant equipped with five axial-flow turbine units of 500 kW each. Low-head stations depend on high flow passage efficiency and repeatable unit performance, so the five units were engineered as a standardized series. Deyang Dongsen Hydropower Equipment Co., Ltd. delivered the full turbine-generator package and supported installation and commissioning.

Project Snapshot

ItemDetail
Project nameXinsheng Hydropower Station
LocationChina
Unit configuration5 units * 500 kW
Turbine typeAxial-flow
SupplierDeyang Dongsen Hydropower Equipment Co., Ltd.
ScopeDesign, manufacture, factory testing, supply, installation and commissioning

Scope of Supply

  • Five axial-flow turbine units with runners and guide apparatus matched to the station's low-head, high-flow duty
  • Five 500 kW generators with excitation and control equipment
  • Inlet and draft tube components, speed governing and unit control panels
  • Auxiliary systems for lubrication, cooling and drainage
  • Standardized spare parts to serve all five units from one common inventory
  • Installation supervision, commissioning and operator training

Engineering Approach

With five identical units, standardization was the central design decision. Common castings and machined components were used across the series, which shortened production and simplified site work: erection crews could repeat the same procedure five times with the same tooling.

Each runner was balanced and each unit factory assembled and tested before shipment. The axial-flow design was configured to keep flow passage losses low and hold efficiency across the station's operating head band, which matters in low-head plants where small losses translate directly into lost output.

Installation and Commissioning

Dongsen engineers supervised installation of the five units in sequence, verifying shaft alignment, blade and guide vane clearances and control system response. Commissioning covered start-up, synchronization, load raising and shutdown tests on the full set, with performance records taken for each unit.

Results

  • Five 500 kW axial-flow units delivered and commissioned as a standardized series
  • Repeatable unit performance verified across all five machines
  • Single spare-parts inventory covering the whole plant, reducing operating cost

Quality Assurance and Spare Parts Strategy

Factory testing covered runner balance, guide vane and blade movement, insulation and electrical tests, and auxiliary system pressure checks on each of the five units. Because the machines share a common component set, the operator can hold one compact spare-parts inventory instead of five separate lists — a practical advantage for a plant of this scale.

Xinsheng illustrates Dongsen's approach to multi-unit low-head projects: series standardization, in-house design and testing, and on-site commissioning that leaves the operator with consistent, well-documented equipment.